Highway 91 bridge replacement to begin mid-April

ADRIAN - Motorists are advised that Highway 91 at the north edge of Adrian will be closed and traffic detoured to replace the bridge over Interstate 90 beginning Monday, April 12.


While I-90 will always remain open to through traffic, at times I-90 traffic may be diverted to the ramps at Highway 91 during certain stages of construction. Highway 91 through traffic will be detoured to Nobles County Roads 35, 15 and 4 for the duration of the project.


The bridge project also includes guardrail replacement and drainage upgrades and should be complete by September.


For a detailed detour map and more information on the project visit www.dot.state.mn.us/d7/projects/hwy91bridge/.



32 views0 comments

28779 Co. Hwy 35

Worthington, MN 56187

(507) 376-6165

info@myradioworks.net

  • White Facebook Icon

Copyright © Radio Works. All rights reserved.